In October 2024 Dalares completed its 2nd verification drillhole at Kene. The 150 m drillhole was drilled at 250m to the north of DR-1 (drilled in 2022) and nearby historical drillholes С-19 (1975) and С-506 (1991) along strike as guided and validated by the geochemical surveys and historical geological data pertaining to the lithium mineralized zone. 120 core samples were taken and shipped to ALS assay laboratory (Ireland) for 60 element grade assays including Li, Ta, Be, Sn and Nb. The test results will come out in February 2025.